List of Public Works Grant Opportunities
SRF Programs
Deadline: Ongoing
Amount: Varies Depending on Project
Match: Low Cost Loan with PF option
https://www.waterboards.ca.gov/water_issues/programs/
Cal OES: Hazard Mitigation Grant Program (HMGP)
Deadline: NOI accepted on a rolling basis, Funding renewed TBD
Amount: Project max is unspecified. $150,000 for single jurisdiction plan, $250,000 for multi-jurisdiction plan.
Match: Generally, HMA funds may be used to pay up to 75% of the eligible activity costs. The
remaining 25% of eligible activity costs are derived from non-Federal sources
Eligibility: States, local communities and tribal governments
https://www.caloes.ca.gov/cal-oes-divisions/recovery/disaster-mitigatio…
Funding Priorities:
● Local Hazard Mitigation Plans (LHMP) updates that will expire within 24 months.
● All other LHMP updates.
● Shovel ready projects with a high level of design that can begin construction within 90 days of FEMA approval, in declared counties.
● Shovel ready projects with a high level of design that can begin constructions within 90 days of FEMA approval, in all other counties.
● Whole community risk reduction/large critical infrastructure wildfire projects.
● Whole community risk reduction/large critical infrastructure projects for other hazard types.
● Wildfire projects in any county.
● All hazard type projects in any county.
● Planning related activities.
● Five percent (5%) Initiative projects.
CalHVIP: Small Fleet Incentive Funding
Deadline: Opens October 21st, first come first serve
Amount: $30.77M available, voucher amounts vary.
Match: No
Link: https://californiahvip.org/funding/
Small Business V oucher Amounts: Public and non-profit fleets with a global fleet of 20 or fewer trucks,
and private fleets with 20 or fewer trucks and $15 million or less of annual revenue are eligible for the
small fleet voucher amount. Fleets may use the small fleet voucher for a lifetime maximum of 5
vehicles. Fleet sizes include vehicles registered as non-operational. Any voucher in excess of 5 will be
eligible for the base voucher amount. See the IM for more details.
CPUC: Cal Advanced Services Broadband Adoption Account
Deadline: January 1, 2026
Amount: The CASF Adoption Account is authorized $20.024 million for fiscal year 2023-2024 to
provide grants to increase publicly available or after-school broadband access and digital inclusion.
Match: Yes, 15%
Link:
https://www.cpuc.ca.gov/industries-and-topics/internet-and-phone/califo…
Purpose: Pursuant to Public Utilities (Pub. Util.) Code section 281, moneys in the CASF Adoption
Account are available to the Commission to award grants to increase publicly available or after-school
broadband access and digital inclusion, such as grants for digital literacy training programs and public
education to communities with limited broadband adoption. The Commission is required to give
preference to programs and projects in communities with demonstrated low broadband access,
including low-income communities, senior citizen communities, and communities facing
socioeconomic barriers to broadband adoption.
California Air Resources Board: FY 2023-24 Planning and Capacity Building RFA (Based on
Draft Requirements)
Deadline: February 10th, 2025
Amount: Up to $500,000 per project
Match: No
Eligibility: Community-based Organizations (CBO), tribal governments, local governments, public
schools
URL:
https://ww2.arb.ca.gov/resources/documents/2025-planning-and-capacity-b…
Summary: Planning and Capacity Building (Planning) is part of the California Air Resources Board’s
(CARB) suite of Sustainable Community-Based Transportation Equity initiatives. This also includes
Clean Mobility Options (CMO), the Clean Mobility in Schools (CMIS), and the Sustainable
Transportation Equity Project (STEP). Together, these programs fund community-led planning and
mobility strategies that support a statewide shift toward clean, shared, and active transportation —
especially in historically under-resourced communities. Planning provides grants to help communities
across California build the foundations for clean and equitable transportation. These grants support
activities like outreach, needs assessments, workforce development, local planning, and community-led
coordination. Many grantees use Planning funds to get ready for future opportunities through STEP,
CMIS, or CMO.
Requirements:
· Partnership between a CBO and a local government is required to apply
· Projects must be completed by 12/31/27
· Applicants are not expected to have fully developed plans at submission. This grant is
intended to support project development over time;
· More than 50% of the Project Community must be within disadvantaged or low-income
census tracts.
CARB encourages partnerships that:
· Prioritize community voices and lived experience
· Reflect the cultural and geographic context of the Project Community
· Share power and decision-making authority with Community Partners
Eligible projects should:
· Increase transportation equity in disadvantaged or low-income communities
· Build local readiness to apply for future implementation grants
· Reflect goals and priorities identified by community members
Examples of eligible project types include:
· Community outreach and education around clean transportation options
· Transportation needs assessments (including surveys, listening sessions, and data
gathering)
· Plans that connect clean mobility to housing, land use, or public health
· Workforce training programs for clean transportation careers
· School-based planning for electric school buses or student-safe routes
· Early-stage collaboration or partnership-building (e.g., developing MOUs, convening
stakeholders)
USDOT FHA: Bridge Investment Program
Deadlines: TBD–original timeline is being revised
● October 1, 2025 for Planning Grants (FY '26 funding).
● November 1, 2025 for Bridge Projects minimum $50M
Amount: $2.5-100M
Eligibility: State governments, City or township governments, County governments, Special district
governments, Others (see text field entitled "Additional Information on Eligibility" for clarification),
Native American tribal governments (Federally recognized)
Match: Yes, varies depending on project size and other funding sources
https://www.fhwa.dot.gov/bridge/bip/
The Bridge Investment Program is a competitive, discretionary program that focuses on existing
bridges to reduce the overall number of bridges in poor condition, or in fair condition at risk of falling
into poor condition. It also expands applicant eligibilities to create opportunity for all levels of
government to be direct recipients of program funds. Alongside states and federal lands management
agencies, metropolitan planning organizations and local and tribal governments can also apply directly
to FHWA, making it easier to advance projects at the local level that meet community needs.
Cal Recycle: Tire Derived Aggregate
Deadline: January 13, 2026 (Cycle 27)
Amount: Up to $750,000 per grant cycle
Match: No
Eligibility: Local government agencies, state agencies, qualifying Indian Tribes, and private, for-profit
entities.
Link:
https://calrecycle.ca.gov/tires/grants/tda/fy202526/?utm_medium=email&u…
Description: The Tire-Derived Aggregate (TDA) Grant Program is designed to promote the use of
recycled tires in civil engineering projects and other applications. TDA is a versatile, lightweight, and
cost-effective alternative to conventional construction materials, and it can be used in a variety of
applications, including retaining wall backfill, lightweight embankment fill, and vibration mitigation.
Projects generally fall into one of five categories (see TDA Uses for more complete descriptions):
Category 1: Mechanically Stabilized TDA (retaining walls).
Category 2: Low Impact Development (storm water mitigation including storm water infiltration
galleries).
Category 3: Lightweight fill (slope stabilization, embankment fill, landslide repair, and retaining walls).
Category 4: Vibration mitigation (under rail lines).
Category 5: Landfill application (aggregate replacement projects such as leachate and gas collection
systems, drainage layers, leachate injection). Projects that are currently underway or that have been
completed at the same location within the same facility within three years of application are not eligible.
Landfill application projects do not include use of shredded waste tires as alternative daily cover or
alternative intermediate cover.
Economic Development Administration (EDA): PWEAA
Due: Rolling basis, no deadline.
Amount: $100,000 to $3,000,000
Match: No
Eligibility:
City or township governments
Native American tribal governments (Federally recognized)
Public and State controlled institutions of higher education
Nonprofits that do not have a 501(c)(3) status with the IRS, other than institutions of higher education
Nonprofits having a 501(c)(3) status with the IRS, other than institutions of higher education
Private institutions of higher education
State governments
County governments
Special district governments
Link: https://www.eda.gov/funding/funding-opportunities
Purpose: EDA has authority to provide grants to meet the full range of communities’ and regions’
economic development needs from planning and technical assistance to construction of infrastructure.
These grants are made through a series of Notices of Funding Opportunity (NOFOs) that can be found
on EDA’s website at https://www.eda.gov/funding/funding-opportunities and are designed to support the
economic development activities most useful to a community based on its needs and circumstances.
EDA funds community or regionally generated ideas and assists communities to advance to the next
level of economic development.
This NOFO, which supersedes the FY20 PWEAA NOFO, sets out EDA’s application submission and
review procedures for two of EDA’s core economic development programs authorized under the Public
Works and Economic Development Act of 1965, as amended (42 U.S.C. § 3121 et seq.) (PWEDA): (1)
Public Works and Economic Development Facilities (Public Works) and (2) Economic Adjustment
Assistance (EAA).
EDA supports bottom-up strategies that build on regional assets to spur economic growth and resiliency.
EDA encourages its grantees throughout the country to develop initiatives that present new ideas and
creative approaches to advance economic prosperity in distressed communities.
Through this NOFO EDA intends to advance general economic development in accordance with EDA’s
investment priorities, but also to pursue projects that, where practicable, incorporate specific priorities
related to equity, workforce development, and climate change resiliency so that investments can benefit
everyone for decades to come.
***CEDS (Comprehensive Economic Development Strategy) needed for EDA grants
USBR: WaterSmart Small-Scale WEE Grant:
Deadline: TBD
Amount: up to $100,000
Match: Yes 50%
Link: https://www.usbr.gov/watersmart/swep/index.html
Through the WaterSMART Small-Scale Water Efficiency Projects Reclamation provides 50/50 cost
share funding to irrigation and water districts, tribes, states and other entities with water or power
delivery authority for small water efficiency improvements that have been identified through previous
planning efforts. Projects eligible for funding include installation of flow measurement or automation in
a specific part of a water delivery system, lining of a section of a canal to address seepage, or other
similar projects that are limited in scope.
Carl Moyer Grant
Deadline: Varies depending on APCD, usually winter
Amount: Varies depending on ask
Match: Yes, 15%
Link: https://ww2.arb.ca.gov/carl-moyer-program-apply
The Carl Moyer Program provides monetary grants to private companies and public agencies to clean
up their heavy-duty engines beyond that required by law through retrofitting, repowering or replacing
their engines with newer and cleaner ones.
These grants are issued locally by air pollution control districts and air quality management districts.
Not all air districts fund every type of Carl Moyer Program project available. Please contact your local
air district for the most updated information on funding availability, project eligibility, applications,
and application selection timeline.
Projects that reduce emissions from heavy-duty on and off-road equipment qualify. This includes
trucks over 14,000 gross vehicle weight, off-road equipment such as construction and farm equipment,
marine vessels and locomotives, stationary agricultural equipment, forklifts, light-duty and other
agricultural sources and airport ground support equipment.
CMAQ and STBG Programs
Deadline: Varies depending on local Transportation commission or COG, Spring 2025
Amount: in the millions
Match: No
Link: look up local COG or TC
https://www.transit.dot.gov/funding/grants/grant-programs/flexible-fund…
Congestion Mitigation and Air Quality (CMAQ) program - The CMAQ program provides a flexible
funding source to state and local governments for transportation projects and programs to help meet the
requirements of the Clean Air Act.
Surface Transportation Block Grant (STBG) - The STBG program provides flexible funding to best
address State and local transportation needs.
U.S. Department of Transportation: INFRA (Nationally Significant Multimodal Freight &
Highway Projects) Program
Deadline: May 2025
Amount: $5 million to $800 million (based on previous round)
Match: Yes
Eligibility: States, MPOs serving urbanized areas, local government, special districts or public
authority with transportation function, tribal governments, multistate corridor organization. The INFRA grant
program funding will be made available under the MPDG combined Notice of Funding Opportunity
(NOFO).
Program URL: https://www.transportation.gov/grants/infra-grant-program
Summary: Program awards competitive grants for multimodal freight and highway projects of
national or regional significance to improve the safety, efficiency, and reliability of the movement of
freight and people in and across rural and urban areas.
Eligible projects:
● A highway freight project on the National Highway Freight Network ● A
highway or bridge project on the National Highway System
● A freight intermodal, freight rail, or freight project within the boundaries of a public or private
freight rail, water (including ports), or intermodal facility and that is a surface transportation
infrastructure project necessary to facilitate direct intermodal interchange, transfer, or access
into or out of the facility
● A highway-railway grade crossing or grade separation project
● A wildlife crossing project
● A surface transportation project within the boundaries or functionally connected to an
international border crossing that improves a facility owned by Fed/State/local government
and increases throughput efficiency
● A project for a marine highway corridor that is functionally connected to the NHFN and is
likely to reduce road mobile source emissions
● A highway, bridge, or freight project on the National Multimodal Freight Network
Federal Highway Administration/DOT: Active Transportation Infrastructure Investment
Program (ATIIP)
Deadline: June 2025
Amount: $100,000 to $15,000,000
Match: 20% - FHWA expects the period of performance to be no more than 2 years for Planning and
Design grants and 5 years for Construction grants.
Eligibility: Local or Regional Governmental Organizations; Multicounty Special Districts; State;
Multistate Group of Governments; or An Indian Tribe.
URL: www.fhwa.dot.gov/environment/bicycle_pedestrian/atiip/
Purpose: The innovative new ATTIP grant program is keen to fund:
• Investment that is uniquely contracted to enable communities to plan and construct connected
active-transportation systems. Priority will be given to local governments and communities
that are planning and building connected active-transportation networks—making it safer and
more convenient for people to get where they need to go on foot, by bicycle and by wheelchair.
Local governments know that this investment is critical to reduce transportation-related
fatalities, strengthen their economies, provide more transportation options to underserved
communities and reduce greenhouse gas emissions.
• Active transportation networks that connect people to everyday destinations like public
transportation, businesses, workplaces, schools and other community activity centers, as well
as active transportation/ trail spines that link communities and regions.
• Active transportation systems planned with community input or aimed at addressing disparities
in bicyclist and pedestrian fatality rates, with opportunities for a higher federal share in
disadvantaged communities.
• A rule to be issued that will encourage the use of categorical exclusions, expedited procurement
techniques and other best practices to ensure that infrastructure is constructed quickly and
efficiently with as little impact as possible.
Eligible projects include, but aren’t limited to:
o Trail construction and maintenance equipment
o Trail/highway crossings and intersections
o Recreational trails
o Trail bridges
o Resilience improvements to pedestrian and bicycle facilities or to protect or enhance use.
o Spot improvement programs (programs of small projects to enhance pedestrian and bicycle use)
o Signing for pedestrian or bicycle routes
o Signs, signals, signal improvements (including accessible pedestrian signals)
o Shared use paths / transportation trails
o Separated bicycle lanes
o Sidewalks (new or retrofit)
o Safety education and awareness activities and programs to inform pedestrians, bicyclists, and
motorists on ped/bike traffic safety laws
o Stormwater mitigation related to pedestrian and bicycle project impacts
U.S. Department of Transportation: Transit-Oriented Development (TOD) Planning Grant
Deadline: Summer 2025
Amount: $13 million is program total
Match: Varies
Eligibility: State or local governmental authorities
URL:
https://www.grants.gov/search-results-detail/349790
Purpose: TOD focuses growth around transit stations to create compact, mixed-use communities
with easy access to jobs and services. TOD capitalizes on public investments in transit and supports
transit systems. Sustainable Community Strategies that help meet the regional targets established by
CARB.
U.S. Department of Transportation: Strengthening Mobility and Revolutionizing
Transportation (SMART) Grants Program
Deadline: Summer 2025
Amount: Up to $2 million
Match: No
Eligibility: States, political divisions of a state, tribal governments, public transportation
authority or agency, public toll authority, MPOs
https://www.transportation.gov/grants/SMART
Program is open to Stage 1: Planning and Prototyping projects. The SMART Grants Program funds
projects that focus on using technology interventions to solve real-world challenges facing
communities, always with a focus on purpose-driven innovation and supporting technologies that
provide clear, near-term benefits. A SMART grant may be used to carry out a project that demonstrates
at least one of the following:
· Coordinated automation
· Connected vehicles
· Sensors
· Systems integration
· Delivery/logistics
· Innovative aviation
· Smart grid
· Traffic signals
California Strategic Growth Council: Community Resilience Centers Program
Deadline: July 2025
Implementation Grant Pre-Proposal Deadline: August 25th, 2023
Amount: Planning grants: $100,000 to $500,000; Project Development grants: $500,000 to $5M;
Implementation grants: $1M - $10M
Match: No
Eligibility: Cities, counties, special districts, JPAs, COGs, nonprofits, tribes, CBOs, community
development finance institutions or community development corporations, emergency management,
response, preparedness and recovery service providers and organizations. All communities are
eligible to apply. SGC Staff will prioritize projects located in under-resourced communities.
Intent to Apply: To demonstrate interest in applying for a CRC Planning Grant, Project
Development Grant, or Implementation Grant, all prospective applicants are strongly
encouraged to submit an Intent to Apply Survey as early as possible.
Program URL: https://sgc.ca.gov/programs/community-resilience-centers/ Summary: SGC’s CRC
program will fund new construction and upgrades of neighborhood-level resilience centers to provide
shelter and resources during climate and other emergencies, such as extreme heat events and poor air
quality days. Program will also fund ongoing year-round community services and programs, such as
food distribution and workforce development training, that build overall community resilience. SGC
will prioritize community-serving locations across the state, such as schools, libraries, community
centers, health clinics, and places of worship. SGC’s CRC program will fund both planning and
implementation activities. There is a pre-proposal phase for Implementation Grants ONLY, which
includes a 5-page concept paper. Those invited will submit full applications.
U.S. Department of Transportation: Charging and Fueling Infrastructure (CFI) Discretionary
Grant Program
Deadline: September 2025
Amount: $500,000 to $15 million; This is a cost reimbursement grant; estimated total program funding
for 2024: $1,321,200,000
Match: Yes, 20%
Eligibility: Counties, cities, public housing authorities, special districts, IHEs, tribal governments
https://grants.gov/search-results-detail/354602
The Charging and Fueling Infrastructure Discretionary Grant Program (CFI Program) is a new
competitive grant program created by President Biden's Bipartisan Infrastructure Law to strategically
deploy publicly accessible electric vehicle charging and alternative fueling infrastructure in the places
people live and work, urban and rural areas alike, in addition to along designated Alternative Fuel
Corridors (AFCs). CFI Program investments will make modern and sustainable infrastructure accessible
to all drivers of electric, hydrogen, propane, and natural gas vehicles. This program provides two
funding categories of grants: (1) Community Charging and Fueling Grants (Community Program); and
(2) Alternative Fuel Corridor Grants (Corridor Program). The Bipartisan Infrastructure Law provides
$2.5 billion over five years for this program. This first round of funding makes $700 million from Fiscal
Years 2022 and 2023 funding available to strategically deploy electric vehicle (EV) charging
infrastructure and other fueling infrastructure projects in urban and rural communities in publicly
accessible locations, including downtown areas and local neighborhoods, particularly in underserved
and disadvantaged communities.
Caltrans: Reconnecting Communities
Deadline: September 2025
Amount: $149M for the entire program.
Match: Not Required, but encouraged
https://dot.ca.gov/programs/local-assistance/fed-and-state-programs/rc-… Highway to Boulevard Pilot
Program: Caltrans' Reconnecting Communities Program centers on equitable community engagement
and relationship building to facilitate a way for affected communities to express how they are burdened
by highway facilities, identify their need for reconnection and improved access, and develop
transformational strategies and connectivity solutions. Funding is intended to assist with the conversion
of key underutilized highways in the state into multimodal corridors to reconnect communities divided
by transportation infrastructure. These legacy impacts will be addressed through community-based
transportation planning, design, demolition, and/or reconstruction of city streets, parks, or other
infrastructure.
CalTrans: Local Highway Safety Improvement Program (HSIP) Cycle 11
Due: September 2025
Amount: min $100k-max $10m
Match: No
Eligibility: Must be a city, a county, or a tribal government federally recognized within the State of
California.
Link:https://dot.ca.gov/programs/local-assistance/fed-and-state-programs/hig…
Purpose: achieving a significant reduction in fatalities and serious injuries on all public roads. The
Division of Local Assistance (DLA) manages California's local agency share of HSIP funds. California's
Local HSIP focuses on infrastructure projects with nationally recognized crash reduction factors (CRFs).
Local HSIP projects must be identified on the basis of crash experience, crash potential, crash rate, or
other data-supported means.
USDOT: Reconnecting Communities Pilot (RCP) Discretionary Grant Program
● Deadline: September 2025
● Match:
○ Community Planning Grants: 80% federal share, 20% local match.
○ Capital Construction Grants: 50% federal share, 50% local match (other federal funds
may increase the federal share to 80%).
● Amount:
○ Planning Grants: Up to $2 million.
○ Capital Construction Grants: $5 million to $100 million.
● Eligibility:
○ Planning Grants: States, local governments, tribal governments, metropolitan planning
organizations, nonprofit organizations.
○ Capital Construction Grants: Facility owners (e.g., states, local governments, tribal
governments) with completed planning activities.
● Link: RCP Program Information
● Summary: The U.S. Department of Transportation's Reconnecting Communities Pilot (RCP)
program offers competitive grants to address and remove transportation infrastructure barriers
that limit mobility and access in communities, particularly those that have been historically
disadvantaged. The program supports projects that remove, retrofit, or mitigate highways, rail
lines, or other facilities that divide neighborhoods, limit access to essential services, or restrict
economic development.
Eligible Projects:
○ Planning Grants: Fund studies and public engagement activities related to removing or
retrofitting existing infrastructure.
○ Capital Construction Grants: Fund the physical removal, retrofit, or replacement of
existing facilities to restore community connectivity.
● Priority Considerations:
○ Projects that demonstrate strong community engagement and partnership.
○ Projects that include strategies for equitable development and anti-displacement.
○ Projects that are ready for implementation, with completed planning and environmental
reviews.
Economic Development Administration (EDA):PWEAA, Recompete, Build to Scale
Deadline: PWEAA is rolling, Build to Scale should be due October 2025
Amount: $100,000 to $30 million.
Match: No
Due: Rolling basis, no deadline.
Link: https://www.eda.gov/funding/funding-opportunities
Purpose: EDA solicits applications from applicants in rural and urban areas to provide
investments that support construction, non-construction, technical assistance, and revolving loan
fund projects under EDA’s Public Works and EAA programs. Grants and cooperative agreements
made under these programs are designed to leverage existing regional assets and support the
implementation of economic development strategies that advance new ideas and creative
approaches to advance economic prosperity in distressed communities. EDA provides strategic
investments on a competitive- merit-basis to support economic development, foster job creation,
and attract private investment in economically distressed areas of the United States.
***CEDS (Comprehensive Economic Development Strategy) needed for EDA grants
USBR: WaterSmart WEE Grant Program:
Deadline: November 2025
Match: Yes 50%
Amount: up to $5 Million
The objective of the WaterSMART Water and Energy Efficiency Grants Funding Opportunity is to
invite states, Indian tribes, irrigation districts, water districts, other organizations with water or power
delivery authority, and partnering nonprofit conservation organizations to leverage their money and
resources by cost sharing with Reclamation on projects that seek to conserve and use water more
efficiently; increase the production of renewable energy; mitigate conflict risk in areas at a high risk of
future water conflict; and accomplish other benefits that contribute to water supply sustainability in the
western United States.
Federal USBOR grant. Can fund scada, installation of water meters, etc.
Link: https://www.grants.gov/search-results-detail/350982
Through WaterSMART Water and Energy Efficiency Grants (formerly Challenge Grants) Reclamation
provides 50/50 cost share funding to irrigation and water districts, tribes, states and other entities with
water or power delivery authority. Projects conserve and use water more efficiently; increase the
production of hydropower; mitigate conflict risk in areas at a high risk of future water conflict; and
accomplish other benefits that contribute to water supply reliability in the western United States.
Projects are selected through a competitive process and the focus is on projects that can be completed
within two or three years.
Rubberized Pavement Grant Program
Deadline: Fall 2025
Amount: The maximum grant award is $250,000 for individual applications, $350,000 for joint
applications, and $500,000 for Qualifying Tribal Entities
Match: No, funds based on amount of rubberized pavement needed (weight)
Eligibility: Local governments (cities, counties, or cities and counties) as defined in PRC section
48617. Other local governmental agencies (including regional park districts, special districts, and Joint
Powers Authorities (JPA) [where all participating entities are otherwise eligible]). Qualifying Tribal
Entities (see Proposed Changes). State Agencies (only for Class 1 bikeways, greenways, and disability
access projects at parks).
Link: https://calrecycle.ca.gov/tires/grants/pavement/fy202324/
Purpose: The Department of Resources Recycling and Recovery (CalRecycle) administers a program
to provide opportunities to divert waste tires from landfill disposal, prevent illegal tire dumping, and
promote markets for recycled-content tire products. The Rubberized Pavement Grant Program is
designed to promote markets for recycled-content surfacing products derived from only
California-generated waste tires. It is aimed at encouraging first-time or limited users of rubberized
pavement in two project types – Rubberized Asphalt Concrete Hot-Mix (Hot-Mix) and Rubberized Chip
Seal (Chip Seal).
Electric Vehicle Charger Reliability and Accessibility
Deadline: January 2026
Amount: A total of $59,484,345 is available under this solicitation.
• A single applicant is
eligible to receive no more than 40% of the total funds awarded under this solicitation..
Match: Varies, more detailed info in the pre app slides.
Eligibility: Public and Private Entities
https://www.energy.ca.gov/solicitations/2024-10/gfo-24-603-californias-…
ty-and-accessibility
Summary: This program addresses EV charger reliability and accessibility issues by funding
projects that enhance network dependability and promote equitable access to charging
infrastructure statewide.
Charging and Refueling Infrastructure for Transport
Deadline: January 2026
Amount: A total of $30 million is available under this solicitation • The minimum grant award
per project is $5 million • The maximum grant award per project is $10 million.
Match: Match funding requirements: • Minimum 50% match of total eligible project costs.
• Minimum 50% of total match must be cash match (or 25% of total project costs).
Eligibility: Local governments, transportation agencies, private businesses, and non-profits.
https://www.energy.ca.gov/solicitations/2024-10/gfo-24-602-charging-and…
port-california?utm_medium=email&utm_source=govdelivery
Summary: This program supports the installation of EV charging and hydrogen refueling
infrastructure along major transportation corridors, focusing on zero-emission vehicle adoption
and reducing greenhouse gas emissions in California.
CalTrans: Sustainable Transportation Grant
Deadline: TBD Fall 2026
Match: 11.47% minimum* (in cash or an in kind contribution). OR 20% match for strategic partnership
grants.
Amount:
Sustainable Communities Grants:
● Minimum: $50,000 for under-resourced communities; $100,000 for others.
● Maximum: $700,000.
Strategic Partnerships Grants:
● Minimum: $100,000.
● Maximum: $500,000 .
Sustainable Communities Grants (Approximately $30 million - $17.5 million/competitive & $12.5
million/formula) to encourage local and regional planning that supports state goals, implements
Regional Transportation Plan (RTP) Sustainable Communities Strategies (SCS) (where applicable), and
to ultimately achieve the State’s greenhouse gas (GHG) reduction target of 40 and 80 percent below
1990 levels by 2030 and 2050, respectively
Strategic Partnerships Grants ($4.5 million) to identify and address statewide, interregional, or
regional transportation deficiencies on the State highway system in partnership with Caltrans. A
sub-category funds transit-focused planning projects that address multimodal transportation deficiencies
Link:
https://dot.ca.gov/programs/transportation-planning/division-of-transpo…
mmunity-planning/sustainable-transportation-planning-grants
USDOT: BUILD Grant
Deadline: January 2026
Amount:
For capital projects located in urban areas, the minimum award is $5 million.
For capital projects located in rural areas, the minimum award is $1 million.
Planning projects do NOT have a minimum award size.
The maximum grant award is $25 million.
Match: Up to 20%
Eligibility: Cities, counties, districts, federal agencies, state agencies
URL: https://www.transportation.gov/RAISEgrants/about
Purpose: RAISE grants will be awarded on a competitive basis, per statute, for planning or constructing
surface transportation infrastructure projects that will improve safety; environmental sustainability;
quality of life; mobility and community connectivity; economic competitiveness and opportunity
including tourism; state of good repair; partnership and collaboration; and innovation.
Objective:
• Invest in surface transportation that will have a significant local or regional impact; and
• Support projects that are consistent with the Department’s strategic goals: improve safety, economic
strength and global competitiveness, equity, and climate and sustainability.
FHWA: Promoting Resilient Operations for Transformative, Efficient, and Cost-Saving
Transportation (PROTECT) Program
Deadline: February 2026
Amount: Planning: $100,000 min, no max, Implementation: $500,000-no max
Match: 0-20%, depending on project
Link: https://www.grants.gov/search-results-detail/356840
Purpose: The purpose of the PROTECT Program is to provide grants on a competitive basis for projects
that seek to strengthen surface transportation to be more resilient to natural hazards, including climate
change, sea level rise, heat waves, flooding, extreme weather events, and other natural disasters through
support of planning activities, resilience improvements, community resilience and evacuation routes,
and at-risk coastal infrastructure.
CalTrans: Active Transportation Program
Due: June 2026
Amount: Unspecified
Match: No, but might be a match if applying to funds from MPO
Eligibility: Local, Regional or State Agencies - Caltrans - Transit Agencies - Natural Resources or
Public Land Agencies - State or local park or forest agencies - State or local fish and game or wildlife
agencies - Department of the Interior Land Management Agencies - U.S. Forest Service - Public Schools
or School Districts - Tribal Governments - Private Nonprofit Organizations (Recreational Trails Program
only) - Any other entity with responsibility for oversight of transportation or recreational trails
Link:https://dot.ca.gov/programs/local-assistance/fed-and-state-programs/act…
Purpose: The purpose of ATP is to encourage increased use of active modes of transportation by
achieving the following goals: Increase the proportion of trips accomplished by biking and walking;
Increase safety and mobility for non-motorized users; Advance the active transportation efforts of
regional agencies to achieve Greenhouse Gas (GHG) reduction goals, pursuant to SB 375 (of 2008) and
SB 341 (of 2009); Enhance public health; Ensure that disadvantaged communities fully share in the
benefits of the program; Provide a broad spectrum of projects to benefit many types of active
transportation users
California Energy Commission (CEC): FAST 2.0 - Fast and Available Charging for All
Californians
Estimated Deadline: TBD March 2026
Amount: Up to $10,000,000 in total funding; maximum of $5,000,000 per project or 50% of total
project costs, whichever is less
Match: Yes; applicants must provide a minimum of 50% match share, with at least half of this as a cash
contribution
Eligibility: All public and private entities with a business presence in California, including California
Native American Tribes and Tribal Organizations. Investor-owned utilities and applicants with more
than 50 active CEC-funded light-duty EV projects are ineligible.
Link:
California Energy Commission
Purpose:
The purpose of this solicitation is to fund projects that deploy fast electric vehicle (EV) charging
infrastructure accessible to the public.
Eligible Funding:
● Direct current fast chargers (DCFC) supplying a minimum of 150 kW to a vehicle
● Installation costs, including planning and engineering design
● Renewable distributed energy resources or energy storage systems providing power to EV
chargers
● Maintenance agreements, warranties, and networking costs (as match share)
Funding Restrictions:
● Projects must be at existing structures/facilities
● At least 50% of EV chargers must be installed within disadvantaged and/or low-income communities
● Charging stations must be publicly accessible for at least 18 hours per day
● Equipment must support multiple payment methods
● All installations must comply with applicable laws, including ADA requirements
LA Metro: MAT Cycle 3
Estimated Deadline: TBD April 2026
Amount: The maximum award for any one project in the Active Transportation Corridor, First/Last
Mile or Pedestrian District category is $10 million. The maximum award for any one project in the
Quick-Build category is $1 million. For non-Quick-Build projects, applicants must indicate whether
their project is scalable and, if so, what elements of the project the applicant would propose to remove
from the scope and its impact on project efficacy. Because of limited funds,Metro may choose to award
an amount less than what is requested if agreed to by the project sponsor. Metro may also choose to
award funding for one or two phases of a project without committing funding to all phase
Match: Metro will prioritize projects that include a funding match for construction and final design
costs
Eligibility: Cities, County of Los Angeles, and Caltrans
Link: https://www.metro.net/about/metro-active-transport-transit-and-first-la…
Eligible Projects:
https://www.dropbox.com/scl/fo/nukqwvmjy30wdogxjyiyb/ADQiLVJvjCN1UP_zCl…
The Metro Active Transport, Transit and First/Last Mile (MAT) program is a multi-year discretionary
program within Measure M. This Cycle 2 Program establishes goals, process, and criteria for the
five-year cycle of the MAT Program for Fiscal Years 2026-2030.Program Purpose and GoalsThe
overarching purpose of the MAT Program is to encourage increased use of active modes of
transportation, such as biking and walking, and enhance pedestrian and bicycle safety. SpecificCycle 2
goals include:Advancing key Metro policies, with a focus on the Active Transportation Strategic
Plan(ATSP), First/Last Mile (FLM) policy, and the Equity Platform Framework;Initiating
implementation of projects in ATSP-identified first/last mile areas, active transportation corridors, and
pedestrian districts;Jump-starting action on building active transportation networks and building
momentum to deliver visible, tangible results;Encouraging, testing, and refining project partnerships and
innovative delivery approaches; andTargeting investments in high-need areas.A one-time special theme
for this cycle is to provide funding support for critical active transportation investments that can be
delivered in time for the 2028 Olympic and ParalympicGames through preferential consideration to
projects in the Board-adopted 2028 Games Mobility Concept Plan (MCP).
USDOT: Safe Streets and Roads for All (SS4A)
Estimated Deadline: Spring 2026
Amount: $100,000 to $25 million
Match: Yes 20%
https://www.transportation.gov/grants/SS4A
Planning and Demonstration Grants provide Federal funds to develop, complete, or supplement a
comprehensive safety action plan. The goal of an Action Plan is to develop a holistic, well-defined
strategy to prevent roadway fatalities and serious injuries in a locality, Tribe, or region. Planning and
Demonstration Grants also fund supplemental planning and/or demonstration activities that inform the
development of a new or existing Action Plan. The Department encourages including demonstration
activities in an application.
SCAQMD: Carl Moyer Grant
Estimated Deadline: Spring 2026
Amount: Varies depending on ask
Match: Yes, 15%
Link:
https://www.aqmd.gov/home/programs/business/carl-moyer-memorial-air-qua…
The Carl Moyer Program provides monetary grants to private companies and public agencies to clean
up their heavy-duty engines beyond that required by law through retrofitting, repowering or replacing
their engines with newer and cleaner ones.
These grants are issued locally by air pollution control districts and air quality management districts.
Not all air districts fund every type of Carl Moyer Program project available. Please contact your local
air district for the most updated information on funding availability, project eligibility, applications,
and application selection timeline.
Projects that reduce emissions from heavy-duty on and off-road equipment qualify. This includes
trucks over 14,000 gross vehicle weight, off-road equipment such as construction and farm equipment,
marine vessels and locomotives, stationary agricultural equipment, forklifts, light-duty and other
agricultural sources and airport ground support equipment.
California Parks & Recreation/California Natural Resources Agency: Environmental
Enhancement and Mitigation Fund
Estimated Deadline: Summer 2026
Amount: up to $750,000, acquisition projects can be up to $1,500,000
Match: Not Required
Link: https://resources.ca.gov/grants/environmental-enhancement-and-mitigatio…
Purpose: This program was created by California Streets and Highways Code Section 164.56 (Article
XIX, Section 1, of the State Constitution), which authorizes the legislature to allocate up to $7 million
each fiscal year from the Highway Users Tax Account (Motor Vehicle Revenues, Section 2100) for
environmental enhancement and mitigation projects that are directly or indirectly related to the
environmental impact of modifying existing transportation facilities or for the design, construction, or
expansion of new transportation facilities. EEM projects must contribute to mitigation of the
environmental effects of transportation facilities. The California Natural Resources Agency (Agency)
prescribes procedures and criteria to evaluate grant project proposals and submits a list of projects
recommended for funding to the California Transportation Commission (CTC). The CTC awards grants
to projects from the Agency’s list.
Cal Transportation Commission: Local Transportation Climate Adaptation Program (LTCAP)
Estimated Deadline: Summer 2026
Amount: Max $50 Million
Match: Yes, 20%
https://catc.ca.gov/programs/local-transportation-climate-adaptation-pr…
The Commission is required to develop program guidelines for the selection of projects that meet all of
the following criteria:
● Increase climate resiliency and protect at-risk transportation infrastructure using California’s
climate projections, as specified in Planning and Investing for a Resilient California: A
Guidebook for State Agencies;
● Are consistent with state, regional, or local climate adaptation reports, plans, and the
Adaptation Planning Guide, including meeting the climate resiliency goals of the region
where the project is located;
● Include outreach conducted by the local agency to under-resourced and vulnerable
communities related to the proposed project, consistent with the California State Adaptation
Strategy; and
● Incorporate environmental equity, protects vulnerable and under-resourced communities,
and provide meaningful benefits to underserved communities, consistent with the California
State Adaptation Strategy.
EPA: Environmental and Climate Justice Community Change Grants Program
Deadline: TBD
Amount: Awards under Track I are expected to be between $10-20 million each and cannot exceed $20
million. Awards under Track II are expected to be between $1-3 million each and cannot exceed $3
million. EPA expects to award approximately $1.96 billion for about 150 Track I awards, including
those under the Target Investment Areas described below in B, and approximately $40 million for about
20 Track II awards.
Match: No cost-sharing or matching is required as a condition of eligibility under this NOFO.
Eligibility: Consistent with CAA §138(b)(3) and Assistance Listing 66.616, applicants eligible to apply
and receive grants under this NOFO are (1) a partnership between two community-based nonprofit
organizations (CBOs) as defined below, or (2) a partnership between a CBO and one of the following: a
federally recognized Tribe, a local government, or an institution of higher education. These types of
partnerships for eligibility purposes are known as Statutory Partnerships. Further eligibility requirements
are described below.
Link:
https://www.epa.gov/inflation-reduction-act/inflation-reduction-act-com…
The Community Change Grants are the final and most comprehensive piece of EPA’s implementation of
ECJP IRA funding. The Community Change Grants will complement grant programs that EPA launched
in 2022 and 2023, including those for the Collaborative Problem-Solving, Government-to-Government,
and Thriving Communities Grantmaker programs. Collectively, these programs will empower
communities and their partners to design, develop, and implement multi-faceted community-driven
projects. These programs will address the diverse and unique needs of disadvantaged communities by: 1.
Reducing and preventing pollution; 2. Building resilience to climate change and mitigating current and
future climate risks; 3. Enhancing meaningful involvement in government processes related to
environmental and climate justice; 4. Expanding access to high-quality jobs and economic opportunity
through workforce development; and 5. Bolstering community strength by ensuring that local residents
receive the benefits of investments and have the opportunity to build on them for current and future
generations.
CalOES: Community Power Resiliency
Deadline: TBD
Amount: Maximum during the last cycle was $300k
Match: No
Link:https://www.caloes.ca.gov/office-of-the-director/policy-administration/…
Summary: The Community Resiliency Grant is the next generation of the Public Safety Power
Shutoff Grant. The grant is to help maintain the continuity of critical services that are vulnerable to
power outages, including Schools, County Election Offices, Food Storage and other locations. This
grant is expected to be reissued by a new cycle has not been publicized at this juncture.
SCAG: Surface Transportation Block Grant & Congestion Mitigation And Air Quality Improvement Programs
Deadline: TBD
Amount: No award floor or ceiling
Match: Matching requirements for STBG and CMAQ funds are dependent on project type, but most
require a minimum of 11.47 percent match in non-federal funds
Eligibility: In general, SCAG cities, counties, transit agencies, federally recognized Tribal
governments, and CTCs are eligible to apply for CMAQ and STBG funds. Each CTC is
responsible for coordination and submission of project nominations to SCAG from eligible
entities from their respective counties. SCAG encourages CTCs to coordinate with SCAG and
other affected CTCs on project nominations for multi-county projects and to support
multi-county agency projects such the California Department of Transportation (Caltrans), the
Los Angeles-San Diego-San Luis Obispo Rail Corridor Agency, and the Southern California
Regional Rail Authority (Metrolink)
https://scag.ca.gov/stbg-cmaq-program
The Congestion Mitigation and Air Quality (CMAQ) Improvement Program was established by the
1991 Federal Intermodal Surface Transportation Efficiency Act (ISTEA) reauthorized with the
passage of Transportation Equity Act for the 21st Century (TEA-21), and superseded by the Safe,
Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU).
Funds are directed to transportation projects and programs which contribute to the attainment or
maintenance of National Ambient Air Quality Standards (NAAQS) in nonattainment or air quality
maintenance areas for ozone, carbon monoxide, or particulate matter (PM) under provisions in the
Clean Air Act (Title 42, United States Code).
The first and foremost priority for CMAQ funds should be cost-effective clean air strategies that
implement the transportation and motor vehicle provisions of the State Implementation Plan (SIP).
For this reason, cost-effectiveness should be the primary criterion in CMAQ project selection. This
will assure that public health benefits of the CMAQ program are maximized and continuation of the
program is justified.
CMAQ (Congestion Mitigation and Air Quality Improvement Program)
● Primary Focus:
○ Reducing air pollution from transportation sources in nonattainment or maintenance
areas for pollutants like ozone, carbon monoxide (CO), and particulate matter (PM).
○ Supporting cost-effective clean air strategies.
● Eligible Projects:
○ Public transit expansion & electrification (bus rapid transit, zero-emission buses,
park-and-ride facilities).
○ Traffic flow improvements (signal synchronization, roundabouts, congestion pricing).
○ Bicycle & pedestrian infrastructure (bike lanes, sidewalks, shared-use paths).
○ Alternative fuel & emissions reduction projects (EV chargers, diesel engine retrofits,
truck stop electrification).
○ Freight and goods movement projects that reduce emissions (e.g., rail electrification).
● Key Requirement:
○ Projects must contribute to air quality improvement in nonattainment or maintenance
areas.
STBG (Surface Transportation Block Grant Program)
● Primary Focus:
○ Flexible transportation funding for a wide variety of projects.
○ Improving highways, bridges, transit, pedestrian/bike infrastructure, and safety.
● Eligible Projects:
○ Highway, road, and bridge construction/rehabilitation.
○ Complete streets & multimodal transportation (bike lanes, pedestrian safety
improvements).
○ Transit capital projects (bus stops, rail station improvements).
○ Safety projects (roadway upgrades, traffic signals, ADA-compliant sidewalks).
○ Intelligent Transportation Systems (ITS) (smart signals, congestion management).
○ Freight movement projects (rail crossings, intermodal improvements).
CEC: Community Energy Reliability and Resilience Investment (CERRI) Program – Round 2
Estimated Deadline: TBD August 2026
Amount: $5,186,701–$20,746,805 per award (up to $51.8M total)
Match: 33.33% (Group 2 – small entities) or 115% (Group 1 – large entities)
Eligibility: Grid operators, electricity generators or storage providers, transmission/distribution
providers, fuel suppliers, or any entity approved as “other relevant entity” by the CEC and U.S. DOE
Link:
https://www.energy.ca.gov/programs-and-topics/programs/community-energy…
Summary:
The CERRI Program provides major infrastructure funding to support projects that increase community
energy reliability and resilience by hardening California’s electric grid against wildfires, storms, and
other extreme events. Eligible activities include undergrounding power lines, battery storage, vegetation
management, utility pole upgrades, advanced conductors, substation hardening, and microgrid
components. Workforce development and community engagement tied to these infrastructure efforts are
also eligible. Projects must serve California communities, and priority is given to those located in
disadvantaged or tribal areas.
Cal Recycle: Rubberized Pavement Grant Program
Estimated Deadline: TBD September 2026
Amount: The maximum grant award is $250,000 for individual applications, $350,000 for joint
applications, and $500,000 for Qualifying Tribal Entities
Match: No, funds based on amount of rubberized pavement needed (weight)
Eligibility: Local governments (cities, counties, or cities and counties) as defined in PRC section 48617.
Other local governmental agencies (including regional park districts, special districts, and Joint Powers
Authorities (JPA) [where all participating entities are otherwise eligible]). Qualifying Tribal Entities (see
Proposed Changes). State Agencies (only for Class 1 bikeways, greenways, and disability access
projects at parks).
Link: https://calrecycle.ca.gov/tires/grants/pavement/fy202526/?utm_medium=em…
Purpose: The Department of Resources Recycling and Recovery (CalRecycle) administers a program to
provide opportunities to divert waste tires from landfill disposal, prevent illegal tire dumping, and
promote markets for recycled-content tire products. The Rubberized Pavement Grant Program is
designed to promote markets for recycled-content surfacing products derived from only
California-generated waste tires. It is aimed at encouraging first-time or limited users of rubberized
pavement in two project types – Rubberized Asphalt Concrete Hot-Mix (Hot-Mix) and Rubberized Chip
Seal (Chip Seal).
